OUR SUCCESSFUL PROJECTS
25mm STEEL PLATE INSTALLATION FOR BASE MOTOR BOX PACKAGING
ACU MST 20 – 6 & 7 COMPRESSOR 25HP REPLACEMENT
3.3KV STATION BOARD TRANSFORMER NGR CUBICLE REFURBISH WORKS
GT TRANSFORMER MITIGATION WORKS
SUMP PUMP PANEL REPLACEMENT
GATE BARRIER INSTALLATION
SLEW ENCORDER BEARING REPAIR
CONVEYOR ROLLER SENSOR REPLACEMENT
STREET LIGHT CABLE REPAIR
TX RECTIFIER CELL
HIGH BAY REPAIR WORKS
SIGNAL CABLE
ROLLER SHUTTER PM & CM
GUL WALL REPAIR
REPAIR WALL CLADDING
DB PANEL
SOLAR STREET LIGHT
Tanjung Bin O & M Berhad
- Electrical Panel Repairing
- Services & Maintenance
- Install Earthing Wire at FGR Tank
- Repairing Of GT Lighting Panel
- Supply & Install new Power Cable
- Supply and Install Fire Resistance Cable
- Modification Works on Granty Crane Cable Drum
- Supply Element Rubber Coupling
- Install Earthing System at BFT
- Install fencing at ECP & ESP
- Supply Rubber Mate for Carbon Brush room
- Supply Channel Spring Nut
- Lighting fitting cum with spring
- Renovation activities
- Supply and lay Power Supply Cable
- Repair Boiler Lift Floor
- Relocate Lighting Point at GTX area
- Supply and Install Cable Pull box Cover
- Supply & Lay Cable Burner U30
- Supply & Lay Control/Signal Cable
- Supply 1200mm X 2440mm X 25mm Mild Steel Plate
- Supply and Install Power Socket Outlet
- Supply Electrical Material
- Motor Breather Repair
- U20 ESP TRU Repair
- Supply and Install Thermocouple
- Install cooper tape at ESP
- Perform Patching and Painting
- Supply and Install Machine Grinding
- Panel Repairing
- 800A HYUNDAI ACB Supply and Installation
- HMI, Scada system and Signal cable installation
- Supply SAMSUNG 48” and 75” LED Monitor TV
- Installation of New Exhaust system
- Rectifier Trans CELL Replacement
NUSTAMINA SDN BHD
The project involved the installation of new power cables, lighting fixtures, power sockets, and fire system point. The project team worked efficiently and effectively to complete the project, and they were able to meet the customer’s needs. The project has improved the safety and efficiency of the customer’s premises. The customer’s premises now have a reliable and efficient electrical supply, they are better lit, their appliances and devices now have a dedicated power supply, and their fire system is now in compliance with safety regulations.
- Supply and lay Power Supply Cable
- Supply, Install and Repair Lighting
- Supply and Install Power Socket Outlet
- Re-Wiring Fire system point
EXACT ANALYTICAL SDN BHD
The project team installed a new panel stand support to provide additional stability to the customer’s existing panel stand. They also installed a new Moisture Analyzer box to provide a dedicated housing for the customer’s Moisture Analyzer. The project has improved the safety and efficiency of the customer’s premises. The customer’s panel stand is now more stable, which reduces the risk of it tipping over. The customer’s Moisture Analyzer is now housed in a dedicated box, which protects it from dust and other contaminants. The customer’s Moisture Analyzer is also now easier to access, which makes it easier to maintain and operate.
- Supply and Install Additional Panel Stand Support
- Installation works for Moisture Analyzer box
YINSON TRANSPORT (M) SDN BHD
- Supply and lnstall Cabin Power Supply Cable
- Supply and Install Lightning / Grounding Copper Tape
- Installation Works of Internal Electrical wiring
ADVANCE JUPITER SDN BHD
- Supply and lay Signal Cable
GLENLITE SDN BHD
- Lay Gen Set Power Cable 11kV
CANELECT SDN BHD
- Install New Air Cond